Expected Public Impact
Lane Closures
- Motorists will experience two-lane traffic with no passing as the northbound and southbound lanes, respectively are closed for construction during the project.
- During Phase II thru IV, oversize loads travelling south must exit at Exit 205 and re-enter I-59 South at Exit 188.
- During Phase II thru IV, oversize loads travelling north must exit Exit 181 (State Route 77) and re-enter I-59 North at Exit 205.
- During Phase V, oversize loads travelling south must exit at Exit 205 and re-enter I-59 South at Exit 181 (State Route 77).
- During Phases V, oversize loads travelling north must Exit 181 and re-enter I-59 North at Exit 205.
Increased State Trooper Presence
- Construction speed limit of 55 MPH will be heavily monitored and enforced by an increased State Trooper presence for the duration of the project.
- Construction speed limit of 45 MPH at Crossovers will be heavily monitored and enforced by an increased State Trooper presence for the duration of the project.
Accident
- During certain phases, any accidents in the project work zone will shut down both lanes until the traffic accidents is cleared.
- During all phases, drivers are urged to comply with posted speed limits and allow safe following distances to reduce the potential for accidents.
Ramp Closures
- Planned ramp closures at Exit 188 during certain phases will impact the public's ability to enter and exit I-59.
Public Delays
- As in all roadway construction projects, the public should anticipate delays especially during high congestion times during the day.